drainage

Lane Street Project: Vick Cemetery in the rain.

Wilson got more than an inch of rain this morning. Here’s what I found at Vick Cemetery as the rain was tapering off.

Saturated ground, standing water, run-off rushing through a cut in the ditch bank (that has been reinforced with riprap), New South’s orange stubs marking gravesites in the middle of this mess.